Public Information Meeting is now live and comments will be accept until September 2, 2022.
To view the project website, please visit www.SavannahHighway.com.
For more information, please contact the Public Works Transportation Division at (843) 202-6137.
CTC = County Transportation Committee
TST = Transportation Sales Tax
Project | Description | Funding Source | Funding Category | Year Funded | Council District | Municipality |
---|---|---|---|---|---|---|
Andros Road | Paving of Andros Road | TST | Rural Roads | 2021 | 8 | Unincorporated Charleston County |
Camp Road Sidewalk and Riverland Drive Multi-Use Path | Installation of a new sidewalk on south side of Camp Road, from Camp Road Middle School to Riverland Drive, and installation of a multi-use path along Riverland Drive from the Camp/Riverland intersection to the Lowcountry Senior Center. | CTC/Federal TAP | CTC/Federal TAP | 2016 | 9 | Town of James Island / City of Charleston |
Capri Isles Drainage | Address drainage issues in Capri Isles community | Stormwater | Stormwater | 7 | ||
Hut and Abram Roads | Improving and widening a portion of Hut Road as well as putting rock down over the whole of Hut and Abram Roads. | TST | Rural Roads | 2021 | 8 | Unincorporated Charleston County |
International Boulevard at Centre Pointe | Extending a the right turn land from west bound Internation Boulevard onto Centre Pointe Drive. | TST | Intersection | 2021 | 5 | City of North Charleston |
Palmetto Commerce Interchange | Construction of a new interchange connecting I-26 to Weber Boulevard between US 78 and Ashley Phosphate Road. | AAII Special Source Bonds | Featured Project | 2016 | 5 | City of North Charleston |
Resurfacing: TST 2023 Hot-In-Place Recycling | Hot In-place Recycling (HIR) is an on-site, in-place pavement preservation and corrective maintenance technique that will be combined with an asphalt overlay. | TST | TST | 2023 | ||
Resurfacing: CTC 2023 Microsurfacing | This pavement preservation project will consist of traffic control, surface preparation, double-microsurfacing, fiber reinforcement, crack sealing, striping and associated appurtenances of various local paved roadways within the boundaries of Charleston County. The approximate total project length is 10 mil | CTC | CTC | 2023 | ||
Resurfacing: CTC 2023 Resurfacing Plan A | This work shall include traffic control, milling, surface preparation, asphalt resurfacing, striping, concrete driveways, and associated appurtenances of various local paved roadways within the boundaries of Charleston County. This project will include River Road (Main to Maybank) Approx 5 miles. | CTC | CTC | 2023 | ||
Woodland Shores Basin Drainage (Carol Street) | Improving drainage along Woodland Shores Basin. Third of 4 phases. | Stormwater | SW | 9 | Unincorporated Charleston County |