Info Public Information Meeting is now live and comments will be accept until September 2, 2022.
To view the project website, please visit www.SavannahHighway.com.

Projects Under Construction

For more information, please contact the Public Works Transportation Division at (843) 202-6137.

CTC = County Transportation Committee

TST = Transportation Sales Tax


ProjectDescriptionFunding SourceFunding CategoryYear FundedCouncil DistrictMunicipality
Andros RoadPaving of Andros RoadTSTRural Roads20218Unincorporated Charleston County
Camp Road Sidewalk and Riverland Drive Multi-Use Path Installation of a new sidewalk on south side of Camp Road, from Camp Road Middle School to Riverland Drive, and installation of a multi-use path along Riverland Drive from the Camp/Riverland intersection to the Lowcountry Senior Center.CTC/Federal TAPCTC/Federal TAP20169Town of James Island / City of Charleston
Capri Isles DrainageAddress drainage issues in Capri Isles communityStormwaterStormwater7
Hut and Abram RoadsImproving and widening a portion of Hut Road as well as putting rock down over the whole of Hut and Abram Roads. TSTRural Roads20218Unincorporated Charleston County
International Boulevard at Centre PointeExtending a the right turn land from west bound Internation Boulevard onto Centre Pointe Drive.TSTIntersection20215City of North Charleston
Palmetto Commerce InterchangeConstruction of a new interchange connecting I-26 to Weber Boulevard between US 78 and Ashley Phosphate Road. AAII Special Source BondsFeatured Project20165City of North Charleston
Resurfacing: TST 2023 Hot-In-Place RecyclingHot In-place Recycling (HIR) is an on-site, in-place pavement preservation and corrective maintenance technique that will be combined with an asphalt overlay. TSTTST2023
Resurfacing: CTC 2023 MicrosurfacingThis pavement preservation project will consist of traffic control, surface preparation, double-microsurfacing, fiber reinforcement, crack sealing, striping and associated appurtenances of various local paved roadways within the boundaries of Charleston County. The approximate total project length is 10 milCTCCTC2023
Resurfacing: CTC 2023 Resurfacing Plan AThis work shall include traffic control, milling, surface preparation, asphalt resurfacing, striping, concrete driveways, and associated appurtenances of various local paved roadways within the boundaries of Charleston County. This project will include River Road (Main to Maybank) Approx 5 miles. CTCCTC2023
Woodland Shores Basin Drainage (Carol Street)Improving drainage along Woodland Shores Basin. Third of 4 phases. StormwaterSW9Unincorporated Charleston County