ABOUT THE PROJECT

The Maybank Highway and Woodland Shores Complete Streets project consists of three components:

  1. Varying width sidewalk (4'-8') along Woodland Shores Road from Maybank Highway to Riverland Drive and associated drainage improvements.
  2. Removal and replacement of existing 5' sidewalk with a varying width sidewalk (5'-6') along Maybank Highway from Woodland Shores to Stefan Drive.
  3. Mid-block crossing with pedestrian refuge and rectangular rapid-flashing beacon (RRFB) across Maybank Highway.

These projects were combined to apply for federal funding under the Complete Streets program. The project will promote safety and connectivity to mass transit and local businesses for all pedestrians, bicyclists, and motorists in the area.


PROJECT STATUS

Sidewalk and storm drainage construction along Woodland Shores Road from Pawpaw Street to Riverland Drive to continue through Q1 2026. Maybank Highway portion of work started mid-January 2026.